Business units
01.
.02
AEE Power Ventures currently owns operating assets and a pipeline including over 500 MW of renewable energy developments in Africa in different stages of maturity.
03.
.04
AEE Power has the ambition to become a key player in the power sector of the continent, addressing the huge electricity supply gap existing in African countries. In fact, one of the group’s companies, Katanga Energy (KATen), has obtained the first ever license to import and sell electricity in the Democratic Republic of Congo.
Business units
01.
.02
AEE Power Ventures currently owns operating assets and a pipeline including over 500 MW of renewable energy developments in Africa in different stages of maturity.
03.
.04
Our Projects
ANGOLA
Extension of a 220/60/15kV substation in Cacuaco
with 2×120 MVA & 2×20 MVA transformers
MT, LT, public lighting and home connections
M’Banza Congo City (34.000 new connections)
CENTRAL AFRICAN REPUBLIC
Reinforcement of HV Lines 70km & 32 transformers
DEMOCRATIC REPUBLIC OF CONGO
Bukanga Lonzo “Parc Agro Industriel”
(220kV substation & OHTL-45 km)
OHTL Goma – Bukavu
(220kV, 93 km)
220/110/70 kV Substation Buhandahanda
OHTL Fungurume-Kasumbalesa
(220kV, 276 km)
OPGW Kasumbalesa-Kikwit
(1680 km over 500kV OHTL)
Inga 3 HPP (11 GW)
ProInga Consortium
(Cobra ACS-AEE)
PMEDE M03
Works on 14 substations (220kV & 30kV)
Kinshasa distribution grid “Poches Noires”
(19.600 new connections)
Lot 6B Network Extension
20/0,4 kV
DJIBOUTI
Ghoubet wind farm – BOP Works
GHANA
Construction of a 161/34.5kV substation with 4×66 MVA transformers
Accra East Phase 1&2
IVORY COAST
Azito Project: GIS 400 KV + AIS
225 KV
Construction of 225 KV Abobo Anyama substation for the Racco Power Line
LIBERIA
Mount Coffee Hydropower Plant
(4×22 MW) O&M during 5 years
NAMIBIA
5 MW PV Power Plants in Rosh Pinah
Signed a 25 years concession under a PPA with AEE Power Ventures
NIGERIA
Wind measurement campaign
Jos Wind Farm (100 MW) with MEASNET certification
Rural electrification project in Kaffrine, Kedougou, Louga, Saint-Louis and Tambacounda regions
KENYA
Last Mile I – rural electrification
3073 km of LV lines & 39.500 new connections
Last Mile I – rural electrification
3276 km of LV lines & 15.500 new connections
Maungu 132/33kV
AIS Substation
Galu-Rabai
222 km of 33kV Overhead Single Circuit Line & OPGW
Thika 220/66/11kV
GIS Substation with 2×200 MVA transformers
Works on 8 Substations
(132/66/33/11kV) & 101 km of MV lines
CABO VERDE
Airfield ground lighting
Airport of the Island of Sal
Thermal station
Airport of the Island of Sal
SENEGAL
OTHL Tobene- Kounoune
(225kV, 55km)
TOGO
MV and LV networks as part of the Lomé electricity network extension project (PEREL)
ZAMBIA
Construction of 49 km 220kV double circuit transmission line
Zambia-DRC Interconnection Project
TANZANIA
Construction of 1x20MVA, 220/33kV substation in Ifakara
RUANDA
Plant design, supply, erection and commissioning of 220kV transmission line Kibuy-Kigoma-Rwabusoro, 220kV transmission line Shema Power Lake Kivu Power Plant-Rubavu and their associated substations