Business units
01.


.02
AEE Power Ventures currently owns operating assets and a pipeline including over 500 MW of renewable energy developments in Africa in different stages of maturity.
03.


.04
AEE Power has the ambition to become a key player in the power sector of the continent, addressing the huge electricity supply gap existing in African countries. In fact, one of the group’s companies, Katanga Energy (KATen), has obtained the first ever license to import and sell electricity in the Democratic Republic of Congo.
Business units
01.

.02
AEE Power Ventures currently owns operating assets and a pipeline including over 500 MW of renewable energy developments in Africa in different stages of maturity.

03.

.04

Our Projects
ANGOLA

Extension of a 220/60/15kV substation in Cacuaco
with 2×120 MVA & 2×20 MVA transformers

MT, LT, public lighting and home connections
M’Banza Congo City (34.000 new connections)
CENTRAL AFRICAN REPUBLIC

Reinforcement of HV Lines 70km & 32 transformers
DEMOCRATIC REPUBLIC OF CONGO

Bukanga Lonzo “Parc Agro Industriel”
(220kV substation & OHTL-45 km)

OHTL Goma – Bukavu
(220kV, 93 km)
220/110/70 kV Substation Buhandahanda

OHTL Fungurume-Kasumbalesa
(220kV, 276 km)

OPGW Kasumbalesa-Kikwit
(1680 km over 500kV OHTL)

Inga 3 HPP (11 GW)
ProInga Consortium
(Cobra ACS-AEE)

PMEDE M03
Works on 14 substations (220kV & 30kV)

Kinshasa distribution grid “Poches Noires”
(19.600 new connections)

Lot 6B Network Extension
20/0,4 kV
DJIBOUTI

Ghoubet wind farm – BOP Works
GHANA

Construction of a 161/34.5kV substation with 4×66 MVA transformers
Accra East Phase 1&2
IVORY COAST

Azito Project: GIS 400 KV + AIS
225 KV

Construction of 225 KV Abobo Anyama substation for the Racco Power Line
LIBERIA

Mount Coffee Hydropower Plant
(4×22 MW) O&M during 5 years
NAMIBIA

5 MW PV Power Plants in Rosh Pinah
Signed a 25 years concession under a PPA with AEE Power Ventures
NIGERIA

Wind measurement campaign
Jos Wind Farm (100 MW) with MEASNET certification
REPUBLIC OF THE CONGO

Djeno Power Plant Rehabilitation
KENYA

Last Mile I – rural electrification
3073 km of LV lines & 39.500 new connections

Last Mile I – rural electrification
3276 km of LV lines & 15.500 new connections

Maungu 132/33kV
AIS Substation

Galu-Rabai
222 km of 33kV Overhead Single Circuit Line & OPGW

Thika 220/66/11kV
GIS Substation with 2×200 MVA transformers

Works on 8 Substations
(132/66/33/11kV) & 101 km of MV lines
CABO VERDE

Airfield ground lighting
Airport of the Island of Sal

Thermal station
Airport of the Island of Sal
SENEGAL

OTHL Tobene- Kounoune
(225kV, 55km)
TOGO

MV and LV networks as part of the Lomé electricity network extension project (PEREL)
ZAMBIA

Construction of 49 km 220kV double circuit transmission line
Zambia-DRC Interconnection Project
TANZANIA

Construction of 1x20MVA, 220/33kV substation in Ifakara
RUANDA

Plant design, supply, erection and commissioning of 220kV transmission line Kibuy-Kigoma-Rwabusoro, 220kV transmission line Shema Power Lake Kivu Power Plant-Rubavu and their associated substations